r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
r pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the buildin
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Entities connected to both Fire Alarm and SF Pool

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATIONProject Architect
ORGANIZATIONGrand Stair
ORGANIZATIONCA Services
ORGANIZATIONATV Garage
ORGANIZATION