3
Shared Docs
3
Same-Page
4 / 3
Mentions
us) was seen off both the Christmas Cove and southern dock site. Methods The NOS St. John and St. Thomas Habitat map Tile 16 (Figure 6.06.1) of the Great St. James area shows the colonized rock pavement and bedrock as well as the offshore seagrass beds. The seagrass beds are not as continuous near the sh
Coastal Zone Permit to construct two docks, one of which is a combination dock and barge landing and a temporary barge landing to provide access to Great St. James Island. A temporary barge landing is being proposed on the northwestern facing beach. This site is to the west of the sand pond and the assoc
ed an application for the existing dock which was approved by DPNR's Division of Coastal 2 EFTA00802625 Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not re
t. Jim, LLC is seeking to construct two docks, one of which is a combination dock/ barge landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow an
vious owner submitted an application for the existing dock which was approved by DPNR's Division of Coastal Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not re
ts when they were surveyed. The southern ramp has been removed. Methods The NOS St. John and St. Thomas Habitat Map Tile 16 (Figure 6.06.1) of the Great St. James area shows the colonized rock pavement and bedrock as well as the offshore seagrass beds. The seagrass beds are not as continuous near the sh
ted an application for the existing dock which was approved by DPNR's Division of Coastal 2 EFTA00802727 Zone Management but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not re
Entities connected to both Great St. and the U.S. Army Corps of Engineers

Jeffrey Epstein
PERSON
U.S. Virgin Islands
LOCATIONErika Kellerhals
PERSON
Great St. James
ORGANIZATIONMaria Farmer
PERSON
William Barr
PERSONChristmas Cove
LOCATION
Oliver Stone
PERSON
New York
LOCATION
Julie K. Brown
PERSON
George W. Bush
PERSON
Samantha Power
PERSONUSACE
ORGANIZATIONThe New York Post
ORGANIZATIONShallow Bay
LOCATIONthe Southern District
LOCATIONNational Marine Fisheries
ORGANIZATION
Department of Justice
ORGANIZATION
Virginia Giuffre
PERSONEmmy Taylor
PERSON