5
Shared Docs
5
Same-Page
5 / 5
Mentions
ar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU di
LS1 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 10/30 31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via emai
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipme
LSJ 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 10/30 31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via emai
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal
ach 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 10/27 31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via emai
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equ
waiting ETA 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 11/1 31. Solar - installation COMPLETE - JE does not like the white light", prefers soft white light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via email 10
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3)
LSJ 30. Cisterns — need to be cleaned /sealed. Vendor on site 10/20 to review scope of work — quoted expected 10/30 31. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light — JE to review when on site - Revised proposal from Pure Logic submitted to JE via emai
Entities connected to both John P. Woods and COMPLETE - JE

Jeffrey Epstein
PERSON
Marc Rich
PERSONCecile de Jongh
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONBuck Steel
ORGANIZATIONLeon Black
PERSON
Samantha Power
PERSON
Oliver Stone
PERSONRichard Barnett
PERSONJohn Deere
PERSONGerry & TJ
ORGANIZATIONLandscaping
PERSONMechanical Building Transformer
ORGANIZATIONBlack Heli
LOCATION
Carlos
PERSONRO & Generators
ORGANIZATIONNanny Cay
LOCATIONArmy Corp 10/17
ORGANIZATIONPure Logic
ORGANIZATION