ar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU di
11/5 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipme
opical 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal
opical 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
ed EDA STT 11/10 24. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as tim
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
very to Tropical 24. LS1 Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — EDA STT 11/23 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & T1 working as tim
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equ
ETA STT 11/10 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as tim
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3)
11/5 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
Entities connected to both John P. Woods and RO & Generators

Jeffrey Epstein
PERSON
Marc Rich
PERSONCecile de Jongh
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONLeon Black
PERSONBuck Steel
ORGANIZATION
Oliver Stone
PERSONLandscaping
PERSONNanny Cay
LOCATIONRichard Barnett
PERSONJohn Deere
PERSONMini Excavator
ORGANIZATIONTerex
ORGANIZATION
Genie
PERSONArmy Corp 10/17
ORGANIZATION
Nassau
LOCATIONLarry Visoski
PERSONBlack Heli
LOCATIONGerry & TJ
ORGANIZATION