ar - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU di
rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List 1011,cda - — t tte_Atliiiiiir - High road waterfall — rocks to be installed EFTA_R1_00463980 EFTA01977455 - Line all roads with
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipme
t rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on MT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require deer protection — Larry will br
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal
rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require deer protection — Larry will br
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
rooms, and storage areas — they remain at 85 degrees 13. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/10 14. Landscaping — Peter's List - Flowers — JE to speak with Peter when he is back on duty - Master Planter — JE to speak with Peter when he is back on duty - High
ar - Fuel Containment Pad — via Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & inst
refusing to return items. Will submit a claim to Tropical STT — EDA to be determined Per JE direction have reordered items from Grainger — 11/4 14. Landscaping — Peter's List - Flowers — Brice has purchased wide variety of cutting flower seeds which will review with JE - Master Planter — JE to speak with P
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equ
t rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection —Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Garden — require deer protection —Electric Fenci
r - Fuel Containment Pad — via Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3)
rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - Flowers - Master Planter - High road waterfall — rocks to be installed EFTA00584502 - Line all roads with stones - Pop's Gard
Entities connected to both John P. Woods and Landscaping

Jeffrey Epstein
PERSONDaphne Wallace
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONCecile de Jongh
PERSON
Condoleezza Rice
PERSON
Lesley Groff
PERSONDarren Indyke
PERSONLeon Black
PERSON
Oliver Stone
PERSONBuck Steel
ORGANIZATIONAnn Rodriquez
PERSON
Samantha Power
PERSONBrice Gordon
PERSONRichard Barnett
PERSONJohn Deere
PERSON
Carlos
PERSONRO & Generators
ORGANIZATIONLarry Visoski
PERSONNanny Cay
LOCATION