3
Shared Docs
3
Same-Page
3 / 3
Mentions
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and TeflitifietielMapensesrwhith-shall--beallwed-asafehlfetere.pew,e9 *edit ettributoble-teierrninetien, Artkle 8 Payments to A
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and TeflitifietielMapensesrwhith-shall--beallwed-asafehlfetere.pew,e9 *edit ettributoble-teierrninetien, Artkle 8 Payments to A
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and direetly-ettributekole-teterminatiort Article 8 • Payments to Architect 8.1 Hourly Rates. Where services are to be compens
ities, septic systems, exterior pavement and curbs for parking, drives, and street connections five feet beyond the building perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplie
Entities connected to both Reimbursable and Geotechnical Engineering

Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONSchematic Design Phase
ORGANIZATIONProject Architect
ORGANIZATIONBasic and Additional Services
ORGANIZATION
Prince Andrew
PERSONGensler
PERSONDesign/Build
ORGANIZATIONProduct Data
ORGANIZATIONthe Project, Client
ORGANIZATIONDesign Development Phase
ORGANIZATIONStructural Engineering
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONProject Scope
ORGANIZATIONClient, Contractor
ORGANIZATIONCivil Engineering
ORGANIZATIONDesign/Build by Contractor
ORGANIZATIONConstruction Administration
ORGANIZATIONSeparate Consultants
ORGANIZATIONMechanical and Support
ORGANIZATION