3
Shared Docs
3
Same-Page
3 / 3
Mentions
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and TeflitifietielMapensesrwhith-shall--beallwed-asafehlfetere.pew,e9 *edit ettributoble-teierrninetien, Artkle 8 Payments to A
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and TeflitifietielMapensesrwhith-shall--beallwed-asafehlfetere.pew,e9 *edit ettributoble-teierrninetien, Artkle 8 Payments to A
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design Intent and do no
mpensation Upon Termination. In the event of termination, Architect shall be compensated for services performed prior to termination, together with Reimbursable Expenses then due, and direetly-ettributekole-teterminatiort Article 8 • Payments to Architect 8.1 Hourly Rates. Where services are to be compens
ctor's proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will conduct up to two (2) reviews of any Submittal as a Basic Service. 3.3. Changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do no
Entities connected to both Reimbursable and Submittal

Jeffrey Epstein
PERSONSubstantial Completion
ORGANIZATIONSchematic Design Phase
ORGANIZATIONBasic and Additional Services
ORGANIZATIONProject Architect
ORGANIZATIONCivil Engineering
ORGANIZATIONConstruction Administration
ORGANIZATIONSeparate Consultants
ORGANIZATION
Prince Andrew
PERSONGensler
PERSONthe Project, Client
ORGANIZATIONDesign/Build
ORGANIZATIONProduct Data
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONDesign Development Phase
ORGANIZATIONClient, Contractor
ORGANIZATIONProject Scope
ORGANIZATIONDesign/Build by Contractor
ORGANIZATIONStructural Engineering
ORGANIZATIONArchitectural Services
ORGANIZATION