t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
t, and shall be provided by Client, Client's consultants, or others: a) Consulting services other than those included in Gensler's scope above. b) Civil Engineering, including shoring, excavation, grading, drainage, on-site and off-site utilities, septic systems, exterior pavement and curbs for parking, drives,
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both Civil Engineering and D.1.1 Initial Payment

Prince Andrew
PERSONStructural Engineering
ORGANIZATIONProduct Data
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATION
Michael Cohen
PERSONReimbursable
PERSONBob Anderson
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION