3
Shared Docs
3
Same-Page
3 / 3
Mentions
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
f, investigating. detecting, abating. replacing, reniediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, Installation, or performance of any Des
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
of, investigating, detecting, abating, replacing, remediating, or removing any items, products, or materials containing hazardous substances. 9.11 Design/Build by Contractor. Architect and its consultants shall have no responsibility for the design, technical adequacy or accuracy, installation, or performance of any Des
Entities connected to both Substantial Completion and Design/Build by Contractor

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONBasic and Additional Services
ORGANIZATIONProject Architect
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONLimitations of Construction Responsibilities
ORGANIZATIONthe Project, Client
ORGANIZATIONClient, Contractor
ORGANIZATIONProject Scope
ORGANIZATIONGensler
PERSONDesign/Build
ORGANIZATIONSeparate Consultants
ORGANIZATIONProduct Data
ORGANIZATIONStructural Engineering
ORGANIZATIONCivil Engineering
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATION