Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
nation. • Plus standard reimbursable expenses. • * Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services are performed in conjunction with the Pool Area work described above, and are integrated into one set
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
ination. • Plus standard reimbursable expenses. ** Allowance, to be billed hourly ••• Pool CD/CA Services pending further review by the Owner. 2. ATV Garage New construction. Assumes all design services me performed in conjunction with the Pool Area work described above, and are integrated into one set
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
dination. * Plus standard reimbursable expenses. " Allowance, to be billed hourly *** Pool CD/CA Services pending further review by the Owner. 2. ATV Garage: New construction. Assumes all design services are performed in conjunction with the Pool Area work described above, and are integrated into one se
Entities connected to both Substantial Completion and ATV Garage

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONProject Architect
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler
PERSONCivil Engineering
ORGANIZATIONProduct Data
ORGANIZATIONBob Anderson
PERSONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONTom Sze
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATIONSF Pavilions
ORGANIZATION