Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
g perimeter. c) Soils or Geotechnical Engineering. d) Fire Alarm and Detection Systems Engineering (fire sprinkler system, fire alarm system). e) Design Services related to utilities to be supplied to the building, including water supply and storage, electrical supply and transformers, propane, and septic sy
Entities connected to both Substantial Completion and Design Services

Jeffrey Epstein
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONthe Schematic Design
ORGANIZATIONConstruction Administration
ORGANIZATIONProject Architect
ORGANIZATIONGensler
PERSONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONProduct Data
ORGANIZATIONCivil Engineering
ORGANIZATIONRobert Jernigan
PERSONTom Sze
PERSONBob Anderson
PERSONArchitectural Services
ORGANIZATIONProject Description
ORGANIZATIONSF Pool Deck
ORGANIZATIONSF Pool
ORGANIZATIONSF Cabana
ORGANIZATION