5
Shared Docs
5
Same-Page
5 / 5
Mentions
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
Gensler will issue the Certificate of Substantial Completion. 3.6 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, Gensler will conduct one field review, and if necessary, one follow-up field review, to observe Contractor's completed punch list items. When Gens
oject. Phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
work to be corrected and review the corrective work to completion. The Architect shall review the status of construction to determine the dates of Substantial Completion and Final Completion. COMPENSATION Initial Payment An initial payment retainer of two thousand dollars j$2,000.001 shall be paid to the Architect
velopment Phase Design Development ARCHITECTURE INTERIORS PLANNING PROPOSAL Pre-Design and Architectural Services With the Clients approval of the Schematic Design, the Architect shall develop the floor plans, exterior elevations and prepare additional details to fix and describe the character of the Project.
work to be corrected and review the corrective work to completion. The Architect shall review the status of construction to determine the dates of Substantial Completion and Final Completion. COMPENSATION Initial Payment An initial payment retainer of two thousand dollars j$2,000.001 shall be paid to the Architect
elopment Phase Design Development ARCHITECTURE INTERIORS PLANNING PROPOSAL Pre-Design and Architectural Services With the Client's approval of the Schematic Design, the Architect shall develop the floor plans, exterior elevations and prepare additional details to fix and describe the character of the Project.
Entities connected to both Substantial Completion and the Schematic Design

Jeffrey Epstein
PERSONReimbursable
PERSONStandard Terms and Conditions
ORGANIZATIONConstruction Administration
ORGANIZATIONSchematic Design Phase
ORGANIZATIONProject Architect
ORGANIZATIONthe American Arbitration Association
ORGANIZATIONArchitect
ORGANIZATIONProduct Data
ORGANIZATIONCivil Engineering
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONDesign/Build by Contractor
ORGANIZATION
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBulletins
PERSON