3
Shared Docs
3
Same-Page
3 / 3
Mentions
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billina Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
tember 18, 2009 Page 10 Attachment A: Gensler Standard Hourly Billing Rates Warwick Wicksman Project Principal/Project Manager $230.00 Tom Sze Project Designer $180.00 Bob Anderson Project Architect $150.00 Senior Professional Staff $140.00 - $200.00 Intermediate Professional Staff $85.00 - $135.00
Entities connected to both Product Data and Project Designer
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIOND.1.1 Initial Payment
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATION