nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
esidence: $ 23,500 4. Dock House: S 22.000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: $50,000 p
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
esidence: $ 23,500 4. Pock House: $ 22,000 $1,003,250 Refer to the Attachment B, Scope and Fee Summary, for additional information. a lump sum D.1.1 Initial Payment. An initial payment shall be paid upon commencement of each phase of Gensler's and our Consultants' services. a) Schematic Design Phase: b) Design
Entities connected to both Product Data and D.1.1 Initial Payment
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION