3
Shared Docs
3
Same-Page
3 / 3
Mentions
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design Issues) to present and review the material. 3
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design Issues) to present and review the material. 3
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
nterior finishes; I) Additional perspective views of 3D "Sketch-up" model as necessary to describe the project. Gensler will provide two copies of the Design Development Documents and will meet with Client one time (location TBD; additional meetings as necessary to resolve design issues) to present and review the material. 3
Entities connected to both Product Data and the Design Development Documents
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION