3
Shared Docs
3
Same-Page
3 / 3
Mentions
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
t. James Pool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 3 2. Design Development. Based on the approved Schematic Design and Client's authorization to proceed, Gensler will proceed with Design Development, to further develop the design, including: a) Site plan; b) Building ele
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
t. James Pool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 3 2. Design Development. Based on the approved Schematic Design and Client's authorization to proceed, Gensler will proceed with Design Development, to further develop the design, including: a) Site plan; b) Building ele
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
t. James Pool Area and Screening Room Agreement for Architectural Services September 18, 2009 Page 3 2. Design Development. Based on the approved Schematic Design and Client's authorization to proceed, Gensler will proceed with Design Development, to further develop the design, including: a) Site plan; b) Building ele
Entities connected to both Product Data and Schematic Design and Client
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION