nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00605621 Gensler Little St. James Pool Area and Screen
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
red by Gensler's consultants; 1) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00724807 Gensler Little St. James Pool Area and Screen
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
red by Gensler's consultants; f) Preliminary project description; g) Perspective views of 3D "Sketch-up" model. Gensler will provide two copies of the Schematic Design Documents and will meet with Client one time (location TBD) to present and review the material. EFTA00727146 Gensler Little St. James Pool Area and Screen
Entities connected to both Product Data and the Schematic Design Documents
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION