nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
The project indudes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
The project Includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
nfirm Field Orders; and d) request proposals for changes in the Work. 3.2.3 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit ("Submittals"), to determine whether those items
The project includes five main areas: 1. New construction of a Pool Area and subterranean Screening Room, including: 13,700 SF Pool Deck with 2,100 SF Pool, 2,500 Covered Porch, 500 SF Shade Structure, 820 SF Cabana, 350 SF Cabana, two 700 SF Pavilions, a 3000 SF Screening Room, and associated Mechanic
Entities connected to both Product Data and SF Pool
Reimbursable
PERSONCivil Engineering
ORGANIZATIONSubstantial Completion
ORGANIZATIONBasic and Additional Services
ORGANIZATIONStructural Engineering
ORGANIZATIONHBRK Associates
ORGANIZATIONGensler
PERSONBob Anderson
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Joe Biden
PERSONEpstein Interests
ORGANIZATIONSchematic Design Phase
ORGANIZATIONDrawings, Specifications
ORGANIZATIONProject Manual
ORGANIZATIONProject Budget or Project
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONGensler Standard Billing Rate Schedule
ORGANIZATIONWarwick Wicksman Project Principal/Project
ORGANIZATIONProject Designer
ORGANIZATION