11
Shared Docs
11
Same-Page
11 / 11
Mentions
oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bat
rdered 11/10 awaiting delivery date - L51 Mats — for all locations Logo approved 10/16 — in production — EDA STT 11/23 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & T1 working as ti
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym NOLpgallatial - installation of the speed bag - David (car
11/5 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bat
dered 11/10 awaiting delivery date - LSJ Mats — for all locations Logo approved 10/16 - in production — EDA STT 11/23 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/28 19. New Employee Bat
ping/delivery details - Extra Restoration Hardware Cushions ordered. Shipped to Tropical 11/20 - LSJ Mats — ETA 11/27 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David
opical 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - David
opical 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production 26. Containers — 2 off site 10/18, 3rd off site 10/20. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as ti
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 17. New Employee Bat
ed EDA STT 11/10 24. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as tim
r drains thru surface, used on St John & St Thomas - Contact Tom Melnick about concrete road construction 11/5 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 17. New Employee Bat
very to Tropical 24. LS1 Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — EDA STT 11/23 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to replace missing loose stones — Gerry & T1 working as tim
gle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review with JE when on site 17. Library - AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor 18. New Employee Bathrooms 19. Gym - New punching bag — installation of the speed bag - on ca
trailer — on site 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 26. Containers — 2 off site 10/18, 3'd leaving LSJ 10/20. RO & Generators in remaining container 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ 28. Part Time Employees — focus on finding housek
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bat
ETA STT 11/10 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 26. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 27. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ working as tim
Entities connected to both Richard Barnett and RO & Generators

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSONLeon Black
PERSONLarry Visoski
PERSON
Condoleezza Rice
PERSONCecile de Jongh
PERSON
Oliver Stone
PERSONLandscaping
PERSON
Samantha Power
PERSONJohn Deere
PERSON
Atlanta
LOCATIONNanny Cay
LOCATIONBuck Steel
ORGANIZATIONGerry & TJ
ORGANIZATIONBlack Heli
LOCATIONMini Excavator
ORGANIZATIONArmy Corp 10/17
ORGANIZATION
Genie
PERSONTerex
ORGANIZATION