oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bat
(1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — awaiting buckets from UK, one received by vendor, 2nd due to vendor 11/16 ETA Tropical 11/19 ETA STT 11/25 - Yellow Black Assort Life Jackets — ordered 11/13 - Floating Pool Mats — for ocean & pool — ordered 11/7 awaiting shipping details - 20ft F
oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/16 19. New Employee Bat
1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — awaiting buckets from UK, one received by vendor, 2 nd due to vendor 11/16 ETA Tropical 11/19 ETA STT 11/25 - Yellow Black Assort Life Jackets — ordered 11/13 - Floating Pool Mats — for ocean & pool — ordered 11/7 awaiting shipping details - 20ft F
oads — ongoing — Peter - JE requested investigating surfaces that can handle the weight of the heavy equipment 18. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, EDA 11/28 19. New Employee Bat
5101E tractor with 553 loader and 8' blade — on site - (1) 2003 Genie Z60/34 Boom lift — on site - (1) 2012 JCB 8035Z Mini Excavator with 2 buckets ETA STT 11/26 - Yellow Black Assort Life Jackets — ordered 11/13 ETA 11/30 - Floating Pool Mats — for ocean & pool — ordered 11/7 awaiting shipping details
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 16. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 17. New Employee Bat
- $39,455 — awaiting buckets from UK, expected EDA STT 11/10 24. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 25. Containers — 3 off site. RO & Generators in remaining container, will be removed once Lull repaired 26. Stone Walls — Repair work to repl
oncrete - $103,600. Researching porous concrete option, water drains thru surface, used on St John & St Thomas 17. Library - AC quote forwarded to Rich Barnett, who had design concerns. Plans forwarded to Atlanta 10/30, engineer will answer concerns & develop control designs, ETA 11/16 18. New Employee Bat
xpress electric golf cars — ETA on LSJ 11/2 - (1) 2012 JCB 8035Z Mini Excavator purchased - $39,455 — at Tropical. Awaiting bucket from UK, expected ETA STT 11/10 25. LSJ Mats — for all locations — ordered 9/22 — Logo approved 10/16 — in production — ETA STT 11/12 26. Containers — 3 off site. RO & Gen
Entities connected to both Richard Barnett and ETA STT

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Richard Kahn
PERSONLeon Black
PERSON
Karyna Shuliak
PERSONLarry Visoski
PERSON
Jes Staley
PERSON
Condoleezza Rice
PERSONDaphne Wallace
PERSONCecile de Jongh
PERSON
Oliver Stone
PERSONKaren
PERSON
Atlanta
LOCATIONLandscaping
PERSONJohn Deere
PERSONBuck Steel
ORGANIZATIONGerry & TJ
ORGANIZATIONBlack Heli
LOCATIONRO & Generators
ORGANIZATION