The dock has been designed so that barges can approach and land on the end of the dock while vessels can dock along the "L.". The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration will be removed upon completion of a usable new dock. It is understood that your a
us) was seen off both the Christmas Cove and southern dock site. Methods The NOS St. John and St. Thomas Habitat map Tile 16 (Figure 6.06.1) of the Great St. James area shows the colonized rock pavement and bedrock as well as the offshore seagrass beds. The seagrass beds are not as continuous near the sh
Coastal Zone Permit to construct two docks, one of which is a combination dock and barge landing and a temporary barge landing to provide access to Great St. James Island. A temporary barge landing is being proposed on the northwestern facing beach. This site is to the west of the sand pond and the assoc
e landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At o
t. Jim, LLC is seeking to construct two docks, one of which is a combination dock/ barge landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow an
ge landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The toy is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At on
t. Jim, LLC is seeking to construct two docks. one of which is a combination dock/ barge landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The toy is very shallow and
e landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At o
us) was seen off both the Christmas Cove and southern dock site. Methods The NOS St. John and St. Thomas Habitat map Tile 16 (Figure 6.06.1) of the Great St. James area shows the colonized rock pavement and bedrock as well as the offshore seagrass beds. The seagrass beds are not as continuous near the sh
e landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At o
ts when they were surveyed. The southern ramp has been removed. Methods The NOS St. John and St. Thomas Habitat Map Tile 16 (Figure 6.06.1) of the Great St. James area shows the colonized rock pavement and bedrock as well as the offshore seagrass beds. The seagrass beds are not as continuous near the sh
Entities connected to both Shallow Bay and Great St.

Jeffrey Epstein
PERSONErika Kellerhals
PERSON
U.S. Virgin Islands
LOCATION
Great St. James
ORGANIZATIONChristmas Cove
LOCATION
St. Croix
LOCATIONFerguson Kroblin
PERSONUSACE
ORGANIZATION
Sarah Ferguson
PERSONNational Marine Fisheries
ORGANIZATION
James Baker
PERSONKingshill
LOCATIONDivision of Coastal Zone Management
ORGANIZATION
Jean-Pierre Oriol
PERSON
George W. Bush
PERSONRoyal Palms Professional Building
ORGANIZATIONGREAT ST
ORGANIZATIONthe Government of the Virgin Islands
LOCATION
Richard Kahn
PERSON
William Barr
PERSON