4
Shared Docs
4
Same-Page
4 / 4
Mentions
e landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The bay is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At o
ulkhead at the shoreline with a small floating dock. The previous owner submitted an application for the existing dock which was approved by DPNR's Division of Coastal Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The
ge landing, and a temporary barge landing to provide access to Great St. James Island. There is currently a small pile-supported dock located within Shallow Bay on the north side of the island. The toy is very shallow and vessels accessing the dock have damaged the shallow seagrass beds within the bay. At on
bulkhead at the shoreline with a small floating dock. The previous owner submitted an application for the existing dock which was approved by DPNR's Division of Coastal Zone Management. but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The
ive (5) people for a period of two (2) weeks and will also require the use of a small excavator and/or track hoe. 4. Clean up of Christmas Cove and Shallow Bay Beachu. We are also requesting permission to remove man-made debris from Christmas Cove and Shallow Bay. We anticipate that the debris removal from
esources 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 Jean-Pierre Oriol Director DPNR — Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 Re: Great St. James Dear Attorney Henry and
ack hoe. 2. Clean up of Christmas Cove and Shallow Bay Beaches. We are also requesting permission to remove man-made debris from Christmas Cove and Shallow Bay. We anticipate that the debris removal from the beaches will take approximately five (5) people a total of eight (8) weeks. It may require the use o
esources 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 Jean-Pierre Oriol Director DPNR — Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 Re: Great St. James Dear Attorney Henry an
Entities connected to both Shallow Bay and Division of Coastal Zone Management
Erika Kellerhals
PERSON
Jeffrey Epstein
PERSON
Cyril E. King Airport
LOCATIONFerguson Kroblin
PERSON
Sarah Ferguson
PERSON
James Baker
PERSONChristmas Cove
LOCATION
St. Croix
LOCATION
Michael Barker
PERSON
Jean-Pierre Oriol
PERSON
Great St. James
ORGANIZATIONGreat St.
LOCATIONAmy Claire Dempsey
PERSONRoyal Palms Professional Building
ORGANIZATIONUSACE
ORGANIZATIONOriol
PERSONNational Marine Fisheries
ORGANIZATION
St Thomas
LOCATIONDavid Rosa
PERSON0 Kellerhals
ORGANIZATION