5
Shared Docs
5
Same-Page
10 / 5
Mentions
ior to the acquisition of Great St. James Island. The morrings were not installed by Great St Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. James Island and not owned by Great St Jim, LLC. Although Great St.
ion I, Paragraphs 7A and 7C, respectively, of the Notice to Cure. Photographs of the completed work are attached for your reference. As you can see, Great St. Jim, LLC is doing everything it can to comply as quickly as possible with DPNR's directives in the Notice to Cure. In continuing work with regard to the
eat St Jim, LLC seeks clarification as to what specifically DPNR claims to be the violation involved in the item described in Paragraph 7B. Although Great St. Jim, LLC disagrees that the retaining wall constitutes a violation, we will be happy to remove it after receiving clarification as to what cure DPNR req
mas. Suite 101. St. Thomas, V i 00802 Telephone I Fax I www keilfercom November 17, 2016 Via Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2fid Floor St. Thomas. VI 00802 Re: Notice to Cure & NOVA-04-16-STT Dear
e Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. They were not installed by Great St. Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. Ja
covering identified in Paragraphs 7A and C would have substantially mitigated any potential for soil erosion, blow off or runoff. In addition, had Great St. Jim, LLC elected to mitigate the potential for soil erosion, blow off and runoff at the site identified in Paragraph 7A by covering the area with a larg
§910(a)(1) is prime example of why further discussion and clarification is required before Great St Jim, LLC takes further action and DPNR declares Great St. Jim, LLC in default under the Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. Th
79.2564 Telephone I 1.888.316.9269 Fax I www.kellfer.com November 17, 2016 Via Hand Delivery & Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 [email protected] Re: Notice to Cur
graph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land which is not part of Great St. James Island. That being said, we are happy to assist DPNR by
n on its removal. 7.H. Four moorings in the water. • The four moorings referred to in paragraph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land w
79.2564 Telephone I 1.888.316.9269 Fax I www.kellfer.com November 16, 2016 Via Hand Delivery & Electronic Mail Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 [email protected] Re: Notice to Cu
l apply for the necessary permits required for that purpose, at that time. As stated earlier, this revised Scope is based on joint meetings between Great St. Jim and DPNR's staff to more fully define the short-term and long-term goals for the Cay. The short-term goals 2 Permit Considerations to CZT-05-17(1)
hments Cc: Attorney Erika Kellerhals. Legal Counsel for Great St. Jim, LLC LeRoy V. Smith, Jr., PE, Principal, Jaredian Design Group Paul Kalloo, Division of Coastal Zone Management 3 Petrie Considerations to CZ T-05-17(11 on Great St. James Coy. St. Thomas, virgin islands Joredion Design Group December 22. 2016 EFTA00602113
otice of Assessment of Civil Penalty, Order for Corrective Action and Notice of Opportunity for Hearing, dated November 4, 2016, and shall work with Great St. Jim, LLC to address DPNR's concerns regarding any and all issues claimed in paragraph seven (7) therein and to promptly cure any and all such issues in
053 Estate Thomas, Suite 101, St. Thomas, V.I. 00802 I www.kellfer.com November 7, 2016 Via Electronic Mail < Michele Baker, Esq. Legal Counsel Division of Coastal Zone Management 8100 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI. 00802 Re: NOVA-04-16-STT Dear Attorney Baker: W
Entities connected to both Great St. James and Division of Coastal Zone Management

Jeffrey Epstein
PERSONErika Kellerhals
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSON
Cyril E. King Airport
LOCATION
Jean-Pierre Oriol
PERSON
James Baker
PERSON
Michael Barker
PERSONV.I.C.
ORGANIZATIONRoyal Palms Professional Building
ORGANIZATIONGreat St.
LOCATION
St. Croix
LOCATIONJohn P. Woods
PERSONChristmas Cove
LOCATIONShallow Bay
LOCATIONDavid Rosa
PERSON
St Thomas
LOCATIONAmy Claire Dempsey
PERSON
George W. Bush
PERSONMaria Farmer
PERSON