5
Shared Docs
5
Same-Page
10 / 5
Mentions
ior to the acquisition of Great St. James Island. The morrings were not installed by Great St Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. James Island and not owned by Great St Jim, LLC. Although Great St.
ion I, Paragraphs 7A and 7C, respectively, of the Notice to Cure. Photographs of the completed work are attached for your reference. As you can see, Great St. Jim, LLC is doing everything it can to comply as quickly as possible with DPNR's directives in the Notice to Cure. In continuing work with regard to the
eat St Jim, LLC seeks clarification as to what specifically DPNR claims to be the violation involved in the item described in Paragraph 7B. Although Great St. Jim, LLC disagrees that the retaining wall constitutes a violation, we will be happy to remove it after receiving clarification as to what cure DPNR req
each bar/cabana referenced in Section I, Paragraph 7G of the Notice to Cure is a non-permanent, moveable structure that Special Project Coordinator David Rosa was made aware of during prior inspections of Great St. James Island. Great St. Jim, LLC respectfully requests clarification as to why this is now
e Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. They were not installed by Great St. Jim, LLC nor have they been nor are they maintained by Great St. Jim, LLC. The moorings are affixed to submerged land which is not part of Great St. Ja
covering identified in Paragraphs 7A and C would have substantially mitigated any potential for soil erosion, blow off or runoff. In addition, had Great St. Jim, LLC elected to mitigate the potential for soil erosion, blow off and runoff at the site identified in Paragraph 7A by covering the area with a larg
§910(a)(1) is prime example of why further discussion and clarification is required before Great St Jim, LLC takes further action and DPNR declares Great St. Jim, LLC in default under the Settlement Agreement. These moorings were in place prior to Great St. Jim, LLC's acquisition of Great St. James Island. Th
0 feet from the dock. The beach bar/cabana referenced in the Notice to Cure is a non-permanent, moveable structure that Special Project Coordinator David Rosa was made aware of during prior inspections of Great St. James Island. Great St. Jim, LLC respectfully requests clarification as to why this is now b
graph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land which is not part of Great St. James Island. That being said, we are happy to assist DPNR by
n on its removal. 7.H. Four moorings in the water. • The four moorings referred to in paragraph 7H of the Notice to Cure, were installed prior to Great St. Jim, LLC's acquisition of Great St. James Island and are not maintained or used by Great St. Jim, LLC. The four moorings are affixed to submerged land w
fcct from the dock • The beach bar/cabana referenced in the Notice to Cure is a non-permanent, moveable structure that Special Project Coordinator David Rosa was made aware of during prior inspections of the island. It is unclear why this must be dismantled and we would appreciate your clarifying DPNR's p
Cay, a search of CZM records was performed and that revealed no permits or authorization letters for EFTA00300105 Settlement Agreement DPNR vs. Great St. Jim, LLC NOVA-04-16-STT Page 2 of 9 development or maintenance were issued for the Property other than a permit for the existing dock on Shallow Bay
ting dock on Shallow Bay which is in the process of being assigned to Respondent. WHEREAS, on or about April 18, 2016, Special Projects Coordinator David Rosa visited the Property to conduct an inspection. WHEREAS, upon arrival and initial inspection Coordinator Rosa observed development activity in vari
CZM records was performed and that revealed no permits or authorization letters for EFTA_R1_00010599 EFTA01733902 Settlement Agreement DPNR vs. Great St. Jim, LLC NOVA-04-16417 Page 2 of 9 development or maintenance were issued for the Property other than a permit for the existing dock on Shallow Bay w
ting dock on Shallow Bay which is in the process of being assigned to Respondent. WHEREAS, on or about April IS, 2016, Special Projects Coordinator David Rosa visited the Property to conduct an inspection. WHEREAS, upon arrival and initial inspection Coordinator Rosa observed development activity in vari
Entities connected to both Great St. James and David Rosa

Jeffrey Epstein
PERSONErika Kellerhals
PERSON
Richard Kahn
PERSON
Sarah Ferguson
PERSONDaphne Wallace
PERSONFerguson Kroblin
PERSONGREAT ST
ORGANIZATION
Jean-Pierre Oriol
PERSON
St. John
LOCATIONGreat St.
LOCATION
James Baker
PERSONthe Coastal Zone
LOCATION
Michael Barker
PERSONRoyal Palms Professional Building
ORGANIZATIONJohn P. Woods
PERSON
Cyril E. King Airport
LOCATION
Marc Rich
PERSONShallow Bay
LOCATIONDivision of Coastal Zone Management
ORGANIZATIONAnn Rodriquez
PERSON