5
Shared Docs
5
Same-Page
5 / 5
Mentions
ent including the roadways and roadway stabilization is discussed in the Master Plan application. The western dock has been located as far north in Christmas Cove as possible while minimizing benthic impacts. The bay is heavily used because it is an excellent mooring area and therefore it is also a suitable l
ock which was approved by DPNR's Division of Coastal Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were issu
existing dock without USACE permits. The applicant will remove the dock as soon as the a new dock is permitted and constructed. A emergency ramp is Christmas Cove. The ramp was built after hurricane Irma to bring emergency supplies to the island for employees and their families who had lost their homes and for
dock which was approved by DPNR's Division of Coastal Zone Management. but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were issu
barge mooring site eagrass offshore well beyond the cobble 41 EFTA00802662 approach Sparse seagrass in the immediate barge The access dock in Christmas Cove is near the location of an old historic dock. The beach is a mixture of sand and cobble. There is rock pavement extending offshore and there is an
oved by DPNR's Division of Coastal 2 EFTA00802625 Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were iss
t of barge mooring site eagrass offshore well beyond the cobble EFTA00802709 approach Sparse seagrass in the immediate barge The access dock in Christmas Cove is near the location of an old historic dock. The beach is a mixture of sand and cobble. There is rock pavement extending offshore and there is an
ock which was approved by DPNR's Division of Coastal Zone Management, but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were iss
people on the island. In order to bring in emergency supplies, two small barge ramps were created near the locations of both proposed docks; one in Christmas Cove and one off the closest point to Little St. James. Both consisted of coral rubble and boulders pushed out into the water approximately 10ft. and bo
roved by DPNR's Division of Coastal 2 EFTA00802727 Zone Management but was not approved by the U.S. Army Corps of Engineers due to objections by National Marine Fisheries because of the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were iss
Entities connected to both Christmas Cove and National Marine Fisheries

Jeffrey Epstein
PERSONErika Kellerhals
PERSON
St. Croix
LOCATIONShallow Bay
LOCATIONGreat St.
LOCATIONUSACE
ORGANIZATIONKingshill
LOCATION
Samantha Power
PERSON
Great St. James
ORGANIZATIONMillepora
PERSONGorgonia
PERSONIrcinia sp
PERSONDendrogyra
LOCATIONJAMES ISLAND
LOCATIONAplysinafidva
ORGANIZATIONShallow Acropora
ORGANIZATION
U.S. Virgin Islands
LOCATIONthe U.S. Army Corps of Engineers
ORGANIZATIONBenthic Habitat Description
ORGANIZATIONPillsbury
ORGANIZATION