5
Shared Docs
5
Same-Page
5 / 5
Mentions
ent including the roadways and roadway stabilization is discussed in the Master Plan application. The western dock has been located as far north in Christmas Cove as possible while minimizing benthic impacts. The bay is heavily used because it is an excellent mooring area and therefore it is also a suitable l
hed. Their qualifications statement will also be in the Appendix of the revised EAR. Letter: The removal of the dock which was not permitted by the USACE is now descripted in the EAR section 5.00. These areas are highlighted for ease of review in the revised EAR. The following has been added to the l
existing dock without USACE permits. The applicant will remove the dock as soon as the a new dock is permitted and constructed. A emergency ramp is Christmas Cove. The ramp was built after hurricane Irma to bring emergency supplies to the island for employees and their families who had lost their homes and for
f the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were issued by the USACE requesting the removal of' the unpermitted structure. The dock however was never removed. The applicant, understands the issues with the existing do
barge mooring site eagrass offshore well beyond the cobble 41 EFTA00802662 approach Sparse seagrass in the immediate barge The access dock in Christmas Cove is near the location of an old historic dock. The beach is a mixture of sand and cobble. There is rock pavement extending offshore and there is an
can approach and land on the end of the dock while vessels can dock along the "L.". The existing dock in Shallow Bay which is not permitted by the USACE in its current configuration will be removed upon completion of a usable new dock. It is understood that your approval of the renewal must be first
t of barge mooring site eagrass offshore well beyond the cobble EFTA00802709 approach Sparse seagrass in the immediate barge The access dock in Christmas Cove is near the location of an old historic dock. The beach is a mixture of sand and cobble. There is rock pavement extending offshore and there is an
the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were issued by the USACE requesting the removal of the unpermitted structure. The dock however was never removed. The applicant, understands the issues with the existing do
people on the island. In order to bring in emergency supplies, two small barge ramps were created near the locations of both proposed docks; one in Christmas Cove and one off the closest point to Little St. James. Both consisted of coral rubble and boulders pushed out into the water approximately 10ft. and bo
the shallowness of the bay. The dock was constructed by the previous owner despite not receiving the federal permit and notices were issued by the USACE requesting the removal of the unpermitted structure. The dock however was never removed. The applicant understands the issues with the existing doc
Entities connected to both Christmas Cove and USACE

Jeffrey Epstein
PERSONAmy Claire Dempsey
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSON
Richard Kahn
PERSONKingshill
LOCATIONBioimpact, Inc.
ORGANIZATIONShallow Bay
LOCATION
U.S. Virgin Islands
LOCATION
Sarah Ferguson
PERSONGreat St.
LOCATIONFerguson Kroblin
PERSONNational Marine Fisheries
ORGANIZATION
Great St. James
ORGANIZATION
Samantha Power
PERSONJules
PERSONDendrogyra
LOCATIONAplysinafidva
ORGANIZATIONGorgonia
PERSONIrcinia sp
PERSON