ent including the roadways and roadway stabilization is discussed in the Master Plan application. The western dock has been located as far north in Christmas Cove as possible while minimizing benthic impacts. The bay is heavily used because it is an excellent mooring area and therefore it is also a suitable l
Jim, LLC, St. Thomas, Virgin Islands for the Construction Temporary Barge Landing, an Access Dock and a Combination Dock and Barge Landing Dear Mr. Oriol; Please see the attached responses to your letter of deficiencies. 1. Please find the list of adjacent property owners attached. 2. A clearance
barge landing should be expanded to include the landing site for the marine electrical cable and the dock facility, that is presently designed for Christmas Cove. As it pertains to the Minor Permits Applications we determined that two separate Minor Permit Applications will be allowed for the scope you wish
Permit Application for work on Great St. James. We also discussed briefly the Master Plan Drawings that you submitted to him several weeks ago. Mr. Oriol offered comments on the work shown within the Master Plan and did reiterate that a Conceptual Master Plan could be approved via a Major Permit Appl
barge landing should be expanded to include the landing site for the marine electrical cable and the dock facility, that is presently designed for Christmas Cove. As it pertains to the Minor Permits Applications we determined that two separate Minor Permit Applications will be allowed for the scope you wish
Permit Application for work on Great St. James. We also discussed briefly the Master Plan Drawings that you submitted to him several weeks ago. Mr. Oriol offered comments on the work shown within the Master Plan and did reiterate that a Conceptual Master Plan could be approved via a Major Permit Appl
believe it is a health issue. In addition to boat wreckage that has languished on the shores of GSJ for years, illegally moored overnight boaters in Christmas Cove have used the shores of GSJ as their own personal trash pile and worse, as a public toilet. The shore is littered with oil and other discharge from
0 Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building 2nd Floor St. Thomas, VI 00802 Re: Great St. James Dear Attorney Henry and Mr. Oriol: Following our meeting with Mr. Oriol and Attorney Michele Baker on April 25, 2016, Mrs. deJongh and I, along with Mr. Epstein began finalizing of
s a health and safety issue. In addition to boat wreckage that has languished on the shores of GSJ for years, illegally moored overnight boaters in Christmas Cove have used the shores of GSJ as their own personal trash pile and garbage dump, and worse, as a public toilet. The shore is littered with oil and oth
Lindberg Bay, Suite 61 Cyril E. King Airport Terminal Building. 2nd Floor St. Thomas, VI 00802 Re: Great St. James Dear Attorney Henry and Mr. Oriol: Following our meeting with Mr. Oriol and Attorney Michele Baker on April 25, 2016, we began finalizing of list of items that we believe need to be
Entities connected to both Christmas Cove and Oriol

Jeffrey Epstein
PERSONDaphne Wallace
PERSONAmy Claire Dempsey
PERSONErika Kellerhals
PERSON
Richard Kahn
PERSON
St. Croix
LOCATION
Sarah Ferguson
PERSONJohn P. Woods
PERSON
Jean-Pierre Oriol
PERSONDarren Indyke
PERSONFerguson Kroblin
PERSON
Marc Rich
PERSONCecile de Jongh
PERSONShallow Bay
LOCATIONQuonset
LOCATION
Joi Ito
PERSONRoyal Palms Professional Building
ORGANIZATION
James Baker
PERSONGreat St.
LOCATIONDivision of Coastal Zone Management
ORGANIZATION