3
Shared Docs
3
Same-Page
3 / 3
Mentions
rliest response. Please do not hesitate to call if you have any questions or concerns. Respectfull submitted, Amy Claire Dempsey, M.A. President, Bioimpact, Inc. BIOIMPACT, INC. Page 1 EFTA00633660 BIOIMPACT, INC. Page 2 EFTA00633661
ika, This proposal includes the permitting of the maintenance of the existing dock through Coastal Zone Management and US Army Corps of Engineers. Dock Maintenance WE need an as•built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart t
rliest response. Please do not hesitate to call if you have any questions or concerns. Respectfull submitted, Amy Claire Dempsey, M.A. President, Bioimpact, Inc. BIOIMPACT, INC. Page 1 EFTA00582905 BIOIMPACT, INC. Page 2 EFTA00582906
ika, This proposal includes the permitting of the maintenance of the existing dock through Coastal Zone Management and US Army Corps of Engineers. Dock Maintenance WE need an as-built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart t
to be produced and circulated. Below I have provided a Scope of Work associated with producing the Environmental Assessment Report and what services Bioimpact, Inc. is proposing to provide and where we will need assistance with. The sections that are self-explanatory I have not elaborated on. Once all the studi
permits but they should be minimal for the systems the size we are looking at. What is there needs works so this is something you should consider. Dock Maintenance I'll need an as-built of the dock which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide the details of
Entities connected to both Bioimpact, Inc. and Dock Maintenance
Amy Claire Dempsey
PERSON
Jeffrey Epstein
PERSONErika Kellerhals
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSON
Paul Ryan
PERSONRyan Wisehart
PERSONUS Army Corps of Engineers
ORGANIZATIONCoastal Zone
ORGANIZATION