7
Shared Docs
7
Same-Page
8 / 7
Mentions
Apr 13, 2018 at 5:58 PM Subject: Fwd: ACE - Cables and Non-compliance To: jeffrey epstein [email protected]> On Thu, Apr 12, 2018 at 5:16 PM, Amy Dempsey < > wrote: I asked for it several weeks ago, I went by and asked again. I asked them just to email it this time and I'll get it printed. Amy Clair
y Dempsey < > wrote: I asked for it several weeks ago, I went by and asked again. I asked them just to email it this time and I'll get it printed. Amy Claire Dempsey, M.A. President, Bioimpact, Inc P.O. Box 132 Kingshill St. Croix, U.S. Virgin Islands 00851 340 690-8445 Fax 340 718-3800 [email protected],
e barge ramps out and pull the fill material back out around the wetland near the point closest to LSJ. I am waiting on old wetland delineation from Ryan Wisehart so I can mark it and we can get the material moved back a couple of feet and plant a few mangroves. Jonathon suggest that if you really want one of
y Dempsey < > wrote: I asked for it several weeks ago, I went by and asked again. I asked them just to email it this time and I'll get it printed. Amy Claire Dempsey, M.A. President, Bioimpact, Inc P.O. Box 132 Kingshill St. Croix U.S. V' 'n Islands 00851 On Thu, Apr 12, 2018 at 3:58 PM, jeffrey E. <jeevacatio
e barge ramps out and pull the fill material back out around the wetland near the point closest to LSJ. I am waiting on old wetland delineation from Ryan Wisehart so I can mark it and we can get the material moved back a couple of feet and plant a few mangroves. Jonathon suggest that if you really want one of
g with you. I look forward to your earliest response. Please do not hesitate to call if you have any questions or concerns. Respectfull submitted, Amy Claire Dempsey, M.A. President, Bioimpact, Inc. BIOIMPACT, INC. Page 1 EFTA00633660 BIOIMPACT, INC. Page 2 EFTA00633661
ock Maintenance WE need an as•built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart to draw the RO line and I can provide the details of the intake. We will file for a minor modification and maintenance for the dock with both CZM an
g with you. I look forward to your earliest response. Please do not hesitate to call if you have any questions or concerns. Respectfull submitted, Amy Claire Dempsey, M.A. President, Bioimpact, Inc. BIOIMPACT, INC. Page 1 EFTA00582905 BIOIMPACT, INC. Page 2 EFTA00582906
ock Maintenance WE need an as-built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart to draw the RO line and I can provide the details of the intake. We will file for a minor modification and maintenance for the dock with both CZM an
articulated pipe if necessary, including reporting and video of activities will be $ 4500.00/day. Additional Services will be billed as following: Amy Claire Dempsey, M.A. Principle $200.00/hour Travel and other Expenses will be billed at Cost I look forward to working with you. I look forward to your earliest
profile drawing as well as site plan drawings. These drawings will need to be provided by a designing engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to have VIWAPA to provide the engineering portions we need. 5.03 Project Workplan: A detailed discussion of th
articulated pipe if necessary, including reporting and video of activities will be $ 4500.00/day. Additional Services will be billed as following: Amy Claire Dempsey, M.A. Principle Travel and other Expenses will be billed at Cost $200.00/hour BIOIMPACT, INC. Page 7 EFTA00583585 I look forward to working wi
works so this is something you should consider. Dock Maintenance I'll need an as-built of the dock which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide the details of the intake. We will file for a minor modification and maintenance for the dock with both CZM an
g reporting and video of activities will be $ 4500.00/day. BIOIMPACT, INC. Page 7 EFTA00584004 Additional Services will be billed as following: Amy Claire Dempsey, M.A. Principle $200.00/hour Travel and other Expenses will be billed at Cost I look forward to working with you. I look forward to your earliest
pplication and follow it through with Verni11 Roberts at DEP $3500.00 Preliminary Site Assessment Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish the new dock location, cable route and the landing site. Based on the size of the project foot print, we esti
Entities connected to both Amy Claire Dempsey and Ryan Wisehart

Jeffrey Epstein
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONKingshill
LOCATIONErika Kellerhals
PERSON
Lesley Groff
PERSONDaphne Wallace
PERSONJonathon
PERSONJohn P. Woods
PERSON
Paul Ryan
PERSON
Sarah Ferguson
PERSONFerguson Kroblin
PERSON
Bill Clinton
PERSONVIWAPA
ORGANIZATIONJonathon Pempek
PERSON
San Juan
LOCATION
Condoleezza Rice
PERSON
Prince Charles
PERSONConstruction Activities & Implementation of Sediment Control
ORGANIZATIONUtilities
ORGANIZATION