0 0.00 3,000.00 01-665 Equipment Operation 80 hrs 25.00 0.00 0.00 2,000.00 01-900 Misc. Expenses 1 tot 1,500.00 0.00 0.00 1,500.00 Division Total 19,400.00 02 Sitework 02-005 Layout / Survey 40 hrs 25.00 0.00 0.00 1,000.00 02-200 Earthwork 1 tot 10,000.00 0.00 0.00 10,000.00
Millwork 1 1 allow tot $7,500.00 $1,000.00 $0.00 $0.00 $0.00 $8,500.00 $0.00 Division Total $43,000.00 07 Moisture / Thermal 07-412 Roofing Assembly 1120 sft $15.00 $1,500.00 $0.00 $18,300.00 07-623 Copper Fleshings 112 Ift $40.00 $300.00 $0.00 $4,780.00 07-632 Downspouts 60 Ift
$0.00 $500.00 01-665 Equipment Operation 24 hrs $25.00 $0.00 $0.00 $600.00 01-900 Misc. EY:I:tenses 1 tot $500.00 $0.00 $0.00 $500.00 Division Total $5,020.00 02 Sltework 02-050 Demolition 80 hrs $20.00 $0.00 $0.00 $1,600.00 02-150 Shoring / Staging 1 tot $5,000.001 $0.00 $0.00 $5
n Total $8,600.00 06 Wood 06-050 Fasteners 1 tot $1,500.00 $0.00 $0.00 $1,500.00 Division Total $1,500.00 07 Moisture / Thermal 07-412 Roofing Assembly 2000 sft $10.00 $0.001 $0.00 $20.000.00 Division Total $20,000.00 09 Finishes 09-510 Bamboo Ceilings 2000 sft $3.00 $0.00 $0.00 $6.0
hrs 1 tot $1,500.00 $0.001 $1,500.00 01465 Equipment Operation $25.00 $0.00; $3,000.00 01-900 Misc. Expenses $5,000.00 $0.00' $5,000.00 Division Total $21,250.00 02-005 02 Sitework Layout / Survey 80 hrs $25.00 $0.00 $0.00 $2,000.00 02-200 02-211 02-281 Earthwork Rock Removal Pest C
0 07-240 I Moisture / Thermal Waterproofing sft EIFS 150 Ift $35.00 $0.00 $900.00 50.00 $500.00 $0.00 $0.00' $0.00 $6,150.001 07-412 Roofing Assembly 1244 sft $25.00 $0.00 $31,100.00 07-623 Copper Flashings 150 Ift $40.00 $20.00 $0.00 $6,500.00 07-632 Downspouts 60 Ift $300.00 $0.
00 1 !Division Total I I $1,500.00 2000 s 07 i Moisture / Thermal I I 07-412 i Roofing Assembly $10.00, $0.001 $0.00. $20.000.00 . 'Division Total $20,000.00 • t 09 Finishes j 1 09-510 'Bamboo Ceilings i 2000 1 aft i $3.00 $0.001 $0.00 56.000.00 09-920 .Painting 1 1 ' tot I $2,50
Fasteners 1 1 I tot 51,500.00; $0.001 $0.00 $1,500.00 1 !Division Total I I $1,500.00 2000 s 07 i Moisture / Thermal I I 07-412 i Roofing Assembly $10.00, $0.001 $0.00. $20.000.00 . 'Division Total $20,000.00 • t 09 Finishes j 1 09-510 'Bamboo Ceilings i 2000 1 aft i $3.00 $0.00
Entities connected to both Division Total and Roofing Assembly
Temporary Enclosures/Safety
ORGANIZATIONRough Carpentry
ORGANIZATIONEquipment Rental
ORGANIZATIONFinish Carpentry
ORGANIZATIONArchitectural Millwork
ORGANIZATIONExterior Wood Doors & Frames
ORGANIZATIONNC Systems
ORGANIZATIONPest Control
ORGANIZATIONPlace Concrete
LOCATION