nditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List 1011,cda - — t tte_Atliiiiiir - High road waterfall — rocks to be installed EFTA_R1
Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. PEiU dixPti' Tindoe r - (3) Terex RL-
nditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on MT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's Ga
Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. Equipment Purchased - (3) Terex RL-40
nditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's G
Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. JE requested that American Steel cost out the price for a new shed also requesting cost of removal of existing bolt pattern & epox
nditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 13. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/10 14. Landscaping — Peter's List - Flowers — JE to speak with Peter when he is back on duty - Master Planter — JE to
a Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpen
guest rooms, and storage areas — they remain at 85 degrees 13. Transient Surge Protection, Blue Storage Bins & Safety Glasses — Tropical shipped to Nassau in error, customer who received goods is refusing to return items. Will submit a claim to Tropical STT — EDA to be determined Per JE direction have
a Cecile 10/25 —there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 22. Steel shed — Buck Steel drawings on site. Shed ordered. EDA to Tropical 12/4, booked to sail 12/7 - Removal of existing bolts patterns & installation of new - David (carpen
onditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection —Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - High road waterfall — rocks to be installed - Line all roads with stones - Pop's G
Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered. Removal of existing bolts patterns & installation of new - David (carpenter) 24. Equipment Purchased - (3) Terex R
nditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees 14. Transient Surge Protection — Tropical shipped to Nassau in error - EDA on STT by 11/6 15. Landscaping — Peter's List - Flowers - Master Planter - High road waterfall — rocks to be installed EFTA005845
Cecile 10/25 — there is an issue with the site possibly being in a flood zone. Reviewing with Jaredian Design Group (John Woods). 23. Steel shed — Buck Steel drawings on site. Shed ordered, will schedule removal of existing bolts patterns and installation of new 24. - (3) Terex RL-4000 6kW Light Tower s
Entities connected to both Nassau and Buck Steel

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSONLarry Visoski
PERSON
Samantha Power
PERSON
Oliver Stone
PERSON
Richard Kahn
PERSONLandscaping
PERSONJohn Deere
PERSONRichard Barnett
PERSONJohn P. Woods
PERSONGerry & TJ
ORGANIZATIONCecile de Jongh
PERSONBlack Heli
LOCATIONRO & Generators
ORGANIZATIONDaphne Wallace
PERSONNanny Cay
LOCATIONMini Excavator
ORGANIZATION