/21 - COMPLETE 4. Five Palms - Painting outside — Primer/Base Coat — color as existing — completed 9/21 - Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, completed by 10/10 - Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — wil
. Engineering — start emptying/relocating items in remaining 20 foot containers 10/9 30. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 31. Part Time Employees —Anna forwarded information of 2 potential part-time housekeepers to Karen 9/25 — Karen to schedul
ete new boom 3. Computers/Phones - Beach office —Internet, phone, Time Clock operational 4. Five Palms - Furniture — outside furniture in place — Karen to tied down cushions to resolved wind issues - COMPLETE - Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — will conti
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00522076 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
— no Internet, phone, Time Clock — Jermaine working on getting cleaning products for fiber 4. Five Palms - Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, completed by 10/11 - Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — wil
Engineering — start emptying/relocating items in remaining 20 foot containers 10/05 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them 29. Part Time Employees — Anna forwarded information of 2 potential part-time housekeepers to Karen. Neither fits the requ
ete new boom 3. Computers/Phones - Beach office —Internet, phone, Time Clock operational 4. Five Palms - Furniture — outside furniture in place — Karen to tied down cushions to resolved wind issues - COMPLETE - Picture frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — will conti
locating items in remaining 20 foot containers — 2 emptied and leaving LSJ on 10/18 28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them EFTA00556193 29. Part Time Employees —focus on finding maids — Karen met with the two applicants on 10/2 — one (Mercedes)
Door Shutters — due on site for installation - 9/6 - Painting - outside to be completed via JE direction - Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, work begins 9/7 - Picture Frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — anothe
ons to be ordered 9/4 32. Engineering — Old Building roof to be painted start — 9/4 33. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ - to start 9/10 34. Solar Lights — installation to continue, placement via 1E's direction EFTA00584519
Entities connected to both Karen and Gerry & TJ

Jeffrey Epstein
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSONLeon Black
PERSONDarren Indyke
PERSONLarry Visoski
PERSON
Carlos
PERSON
Oliver Stone
PERSON
Samantha Power
PERSONJermaine Ruan
PERSONCecile de Jongh
PERSONRichard Barnett
PERSON
Martha Stewart
PERSONJohn Deere
PERSONBuck Steel
ORGANIZATIONLandscaping
PERSONMechanical Building Transformer
ORGANIZATION
Atlanta
LOCATIONChillax Bathroom
PERSONBlack Heli
LOCATION