5
Shared Docs
5
Same-Page
5 / 5
Mentions
e U.S. Army Corps of Engineers Antilles District, Annex Building, Fundacion Angel Ramos, 2nd Floor, Suite 202, Franklin Delano Roosevelt Ave. #383, San Juan, PR 00918 for their review and approval. Early advice concerning your decision in this matter will be appreciated. Very truly yours, Erika Kellerh
inage, Flooding and Erosion Control 24 6.04 Fresh Water Resource 29 6.05 Oceanography 29 6.06 Marine Resources and Habitat Assessment 37 6.07 Terrestrial Resources 47 6.08 Wetlands 49 6.09 Rare and Endangered Species 54 6.10 Air Quality 55 EFTA00802622 SECTION PAGE 7.00 IMPACT OF THE PROPOSE PROJECT
o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation. 6.08 Wetlands: Bioimpact, Inc.
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
INC. Page 4 EFTA00583582 within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NN1FS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ely map the benthic resources within the area. We will address Essential Fish Habitat in this section of the EAR to meet the NMFS requirement. 6.07 Terrestrial Resources: The report will address the shoreline areas that will be potentially impacted during the power cable installation and dock access. 6.08 Wetlands:
Entities connected to both San Juan and Terrestrial Resources

Jeffrey Epstein
PERSON
Puerto Rico
LOCATION
Charlotte Amalie
LOCATION
George W. Bush
PERSON
Bill Clinton
PERSON
U.S. Virgin Islands
LOCATION
Nassau
LOCATION
Bahamas
LOCATIONGreat Bay
LOCATION
William Barr
PERSON
Samantha Power
PERSON
Tortola
LOCATION
Jacksonville
LOCATION
Charlotte
LOCATION
Paul Ryan
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSON
Sarah Ferguson
PERSON
Anguilla
LOCATIONRedhook
LOCATION