xisting sub base. • Compact sub base to insure stability • Spread and compact 3 inches of aggregate base material • Place new 3•inch reinforced Portland cement concrete pathway, mimimum 4=inch pavement is recommended for vehicular and equipment traffic. Concrete will be a minimum 4,000 PSI. SPECIAL
.00 Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. Concrete Swales Described above 32 51.064.00 EA $34.048.00 Aggregate Base Pad Described above 31 S182.00 EA S5.824.00 Rip Rap Detention Area Described
e. • Compact sub base to insure stability • Spread and compact 3 inches of owner-supplied aggregate base material • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
n Drainage Measures: As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18. 2014. Concrete Swales Described above 32 51.064M0 EA 534.048.00 Aggregate Base Described above 32 5181.00 EA S5.824.00 Pad Rip Rap Detention Described above
nd compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
00 Option Measures: As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18. 2014. Concrete Swales Aggregate Base Pad Rip Rap Detention Area Options Total Described above 32 51.064.00 EA Described above 32 $182.00 EA Described above
nd compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
ion Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. Concrete Swales Described above 32 S1.064.00 EA $34.048.00 Aggregate Base Described above 32 S182AM EA 55.824.00 Pad Rip Rap Detention Described above
Entities connected to both Poland and Concrete Swales
Asphalt Pathways Paving Works
ORGANIZATIONCrown Bay Marina
LOCATIONBetteroads Asphalt LLC
ORGANIZATIONQuantum Vision Construction LLC
ORGANIZATIONTack Coat
PERSONBetteroads Asphalt
PERSONPortland Cement
LOCATION