xisting sub base. • Compact sub base to insure stability • Spread and compact 3 inches of aggregate base material • Place new 3•inch reinforced Portland cement concrete pathway, mimimum 4=inch pavement is recommended for vehicular and equipment traffic. Concrete will be a minimum 4,000 PSI. SPECIAL
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 September 12, 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and
e. • Compact sub base to insure stability • Spread and compact 3 inches of owner-supplied aggregate base material • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
on Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 Construction Proposal January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
nd compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
nd compact 3 inches of owner-supplied aggregate base material • Apply Tack Coat prior to asphalt concrete placement • Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: • LSJ will remove, secure, and replace all stone and other border edges.
Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existin
Entities connected to both Poland and Asphalt Pathways Paving Works
Crown Bay Marina
LOCATIONConcrete Swales
LOCATIONQuantum Vision Construction LLC
ORGANIZATIONBetteroads Asphalt LLC
ORGANIZATIONTack Coat
PERSONBetteroads Asphalt
PERSONPortland Cement
LOCATION