4
Shared Docs
4
Same-Page
6 / 4
Mentions
vilion bathrooms, pavilion side entrances, pavilion basement access & service, and concept palette #1) do you have any other questions/comments? 2. Warwick (my project manager) has been working with Doug on the final proposal, as well as retainer invoices we need (for us and our consultants) to begin co
Cc: Amber Ratliff; Bob Anderson Subject: RE: Little St James Attached are Invoices for our DD retainer, and the Consultants SD retainer. Thanks, Warwick Warwick Wicksman, AIA Principal Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Warwick Wicksman Sent: Thursday, Ma
nd Structure, along the others. At this point, we have used up our entire SD fee, so to get the next phase moving, we need the next retainers. For Architecture, the next retainer is $50,000 (DD retainer). For the consultants, the retainer is $33,875 (50% of their SD fee). These are each outlined in the prop
ilion bathrooms, pavilion side entrances, pavilion basement access & service, and concept palette #1) do you have any other questions/comments? 2. Warwick (my project manager) has been working with Doug on the final proposal, as well as retainer invoices we need (for us and our consultants) to begin c
Cc: Amber Ratliff; Bob Anderson Subject: RE: Little St James Attached are Invoices for our DD retainer, and the Consultants SD retainer. Thanks, Warwick Warwick Wicksman, AIA Principal Gensler EFTA_R1_00202754 EFTA01827576 Santa Monica, California 90404 USA From: Warwick Wicksman Senlia...00
nd Structure, along the others. At this point, we have used up our entire SD fee, so to get the next phase moving, we need the next retainers. For Architecture, the next retainer is $50,000 (DD retainer). For the consultants, the retainer is $33,875 (50% of their SD fee). These are each outlined in the pro
und 4:00 PST. I am also available to speak=any time tomorrow; I am scheduled to be in the office all day. EFTA_R1_02000461 EFTA02683390 Thanks! Warwick =nbsp;&=bsp; &nbs=; &=bsp; Warwick Wicksman, AIA Principal From: Jeffrey Epste=n Imailto:[email protected]] Sent: Monday, April 12, 2010
hment B, pages 11 and 12 of the attachment, for the detailed fee break=own requested for each consultant. I added some notes on page 11. T=e current Architecture and Consultant invoices are also attached for reference.<=o:p> Each of the consultants has been paid for the Schematic Design=services, previously
again today, but will be back around 4:00 PST. I am also available to speak any time tomorrow; I am scheduled to be in the office all day. Thanks! Warwick Warwick Wicksman, AIA Principal Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA From: Jeffrey Epstein [mailto:jeevacation@g
ment B, pages 11 and 12 of the attachment, for the detailed fee breakdown requested for each consultant. I added some notes on page 11. The current Architecture and Consultant invoices are also attached for reference. Each of the consultants has been paid for the Schematic Design services, previously complet
Entities connected to both Warwick and Architecture

Jeffrey Epstein
PERSONWarwick Wicksman
PERSONGensler
PERSON
Santa Monica
LOCATIONGary Kerney
PERSONDoug Schoettle
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONDarren Indyke
PERSONBob Anderson
PERSONDesign Development
ORGANIZATIONAmber Ratliff
PERSON
Bradley Edwards
PERSONCurtis Royston
PERSONDesign Development & Consultant Coordination
ORGANIZATIONaccess & service
ORGANIZATIONConsultants SD
ORGANIZATIONMechanical, Electrical
ORGANIZATION