3
Shared Docs
3
Same-Page
3 / 3
Mentions
this list =o that we can clearly identify and understand the squawk and so that we al= work off of one (1) list to resolve these items. Thank you. ERIC H. ROTH =span style="font-size:9.0ptfont-family:"Arial","sans-ser=f";color:$1644e39u> PRESIDENT <image007.jpg><=> P 631.737.5900 <tel:631.737.5900> I C 51
flight, there are certain lights in the upwash / downwash lightin= that are inoperative and/or intermittent. Doors = Aft La=atory to Baggage Door- L/H #2=Single Seat- EFTA_R1_01746319 EFTA02575123 R/H #2=Master Switch Panel- Galley=and Lavatory Door/Drawers- Tables= Entert=inment System - Cockpi=
From: Jeffrey Epstein <[email protected]> Sent: Thursday, October 17, 2013 12:48 PM To: Eric Roth; Ivjet; Richard Kahn Subject: Re: GIV s/n 1085 N212JE Final INvoice thanks . Lets see how this trip goes. I appreciate t=e effort. , I assume you
the aft lavatory trash door, the lavatory/baggage door, et=., conference table leather blotters, metal plated cup holders / leather s=roud, rewiring L/H #2 seat switch, i-Phone 5 docking station, etc =85.. Lastly, I had GIV model custom made for you as an exac= replica including your logo by the entry
From: Eric Roth < Sent: Saturday, September 28, 2013 4:14 PM To: 'Jeffrey Epstein': 'Ivjet Cc: 'Jay Massar' Subject: Some of the Squawks - please read Attac
galley and aft lavatory that opened in =light. </=:p> Aft Lavatory =o Baggage Door- JE =dentified that the door would not latch =roperly. </=:p> L/H #2 =ingle Seat- JE noted =hat when compared to the R/H #2 seat, the electric seat function =ontrols are not sequenced the same (fwd / middle / aft swit
Entities connected to both Eric Roth and L/H #2