5
Shared Docs
5
Same-Page
5 / 5
Mentions
fined as the plans are developed and the scope is clarified. Recent questions you reviewed with Silvina have been incorporated. The cost related to Pinto's input (paint finishes, lighting layout, decorative electrical fixtures, millwork, floor finishes and plumbing fixtures) are unknown at this time b
lowed respectable numbers. The costs for the mechanicals and roof are dependant on the engineering plans and specifications which will be issued by Gensler's Mechanical engineers. I have also allowed a resonable amount for these items, but they will change when we update to the new plans. General Condi
dget is based on the Office Pavilion, which in my opinion was over designed. • The paint finish is a simple in house job and does not account for a Pinto or designer look. No paint in the bedroom because this requires some designer repairs. • All stone floors and walls are Coral stone. • Existing be
ian and Brian for the plumber - Glidden agreed to sign off on Gary's work, I have not got a professional to sign off for the plumbing as of yet. • Gensler has not reviewed the HVAC system I specified with Dave Gott, but I'm confident that their specifications will not be much different. • Gensler has
fined as the plans are developed and the scope is clarified. Recent questions you reviewed with Silvina have been incorporated. The cost related to Pinto's input (paint finishes, lighting layout, decorative electrical fixtures, millwork, floor finishes and plumbing fixtures) are unknown at this time b
lowed respectable numbers. The costs for the mechanicals and roof are dependant on the engineering plans and specifications which will be issued by Gensler's Mechanical engineers. I have also allowed a resonable amount for these items, but they will change when we update to the new plans. General Condi
=get is based on the Office Pavilion, which in my opinion was over designed= • The paint finish is a simple in house job and =oes not account for a Pinto or designer look. No paint in the bedroom beca=se this requires some designer repairs. • All stone floors and walls are Coral stone. " Existing
n and Brian for the plumber - Glidden agreed to sign off on Gary=92s work, I have not got a professional to sign off for the plumbing as of=yet. • Gensler has not reviewed the HVAC system I spe=ified with Dave Gott, but I'm confident that their specifications will n=t be much different. • Gensler has
or package and nonrefundable) 5. Gensler - upon new agreement pay 66,263.78 6. LSJ Slip C10 - paying 0.91 per foot vs 1.16 that Brice agreed to 7. Pinto still owes JE 40K Euro for decoration belts 8. Tatyana - Promissory Notes (33.950 and 20,000) 9. Adam Bly - 2 month extension until August 16th on
5 4. Robert Couturier invoice 42,483.54 (they claim they deducted 25K only as other 25K was for work on the interior package and nonrefundable) 5. Gensler - upon new agreement pay 66,263.78 6. LSJ Slip C10 - paying 0.91 per foot vs 1.16 that Brice agreed to 7. Pinto still owes JE 40K Euro for decorati
Entities connected to both Pinto and Gensler

Jeffrey Epstein
PERSONGary Kerney
PERSON
Marc Rich
PERSON
Richard Kahn
PERSONDoug Schoettle
PERSONLeon Black
PERSON
Samantha Power
PERSONDarren Indyke
PERSON
Stephen Hawking
PERSON
Lesley Groff
PERSONAndrew Farkas
PERSON
George Mitchell
PERSON
Julie K. Brown
PERSON
Condoleezza Rice
PERSON
Prince Andrew
PERSON
Ghislaine Maxwell
PERSON
Prince Charles
PERSON
Sarah Kellen
PERSON
Eric Trump
PERSON
San Diego
LOCATION