We are awaiting this. iv) Wireless Network Computer — This has been removed from 7 Is' Street and installed at 656' Street. GM has requested that Pinto prepare coloured boards for the entry hall of 71s' street. We have heard nothing back from Pinto on this. We will chase when the offices open in Se
day September 9. viii) Expected date to erect building is September 13. ix) Plumbing — has received three quotes on three options, find attached. Gary Kerney has recommended that we go for Option 2 at $102,680.00 as opposing to the initial suggested quote of $50,680.00 (Option I) which was to tie the new
dget is based on the Office Pavilion, which in my opinion was over designed. • The paint finish is a simple in house job and does not account for a Pinto or designer look. No paint in the bedroom because this requires some designer repairs. • All stone floors and walls are Coral stone. • Existing be
From: "Stephen Caplinger" <I To: "'Gary Kemey"' Cc: <1 >, "'Jeffrey Epstein" <[email protected]> Subject: FW: Revised Master Budget Date: Fri, 05 Jun 2009 21:38:29 +0000 Attachments: ma
ls in a sky blue color(which loo=s like what he is doing) The two smaller rooms were supposed to be white with horizontal stripe detail to match the Pinto photo I gave him; one with a lavender stripe and one with a cranberry stripe. <=r>-- Th= information contained in this communication is confidentia
From: Jeffrey Epstein <[email protected]> Sent: Tuesday, December 14, 2010 3:02 AM To: ion nicola; Emad Hanna; Gary Kerney the large room is to be all blue on the walls in a sky blue color(which loo=s like what he is doing) The two smaller rooms were supposed to be whit
nto we poured the master floor and start up with walls tommorow.we are rapidly approaching needing to know the interior finishes. any response from Pinto? Gary EFTA_R1_01506273 EFTA02434569
To: Jeffrey Epstein[[email protected]] From: Gary Kerney Sent: Tue 10/27/2009 4:51:59 PM Subject: Pinto we poured the master floor and start up with walls tommorow.we are rapidly approaching needing to
rk underway and everything including Landscaping is scheduled to be completed by April, assuming we conclude the collumns shortly.Any responce from Pinto on the package? When we get the additional supervisors and support Labor we will throw them at additional major projects you approved. My presumed
To: Jeffrey [email protected]] From: Gary Kerney Sent: Wed 11/4/2009 6:13:15 PM Subject: jobs progress Jeffrey Since our meeting in Palm Beach, we have interviewed (4) supervisors hired one to
Entities connected to both Pinto and Gary Kerney

Jeffrey Epstein
PERSONBrice Gordon
PERSON
Marc Rich
PERSONEmad Hanna
PERSONDoug Schoettle
PERSONGensler
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSON
Stephen Hawking
PERSON
Sarah Kellen
PERSON
Lesley Groff
PERSONDaphne Wallace
PERSONStephen Caplinger
PERSONLeon Black
PERSON
Ghislaine Maxwell
PERSON
Alberto
PERSON
Zorro
LOCATIONMaria Farmer
PERSON
Saint James
LOCATION