3
Shared Docs
3
Same-Page
3 / 3
Mentions
lor 13A Twin socket. 15 1,627.63 24,61403 6,685.77 303 Supply and installoIon of I3Amp Single synched socket above lobe ceiling la FCU: Make: Schneider, White PVC 25 Nos. 3,64403 9149310 25,10939 3.09 Supply and installoIon of I3Amp Single synched socket above false ceiling lawater Neater: Ma
O RM. DESCRIPTION WY UNIT UNIT PRICE IAED1 AMOUNT (AED) AMOUNT (USD) P PRELIMINARIES • -- Design Procedures (Includes Design & concept. Consrucilon & waking trawigs) 1 Item 1,39).830.00 1,390,800.00 331,041.10 Supply of required approvals from aulhally ( Muncipality/ avi Defence and Local m
or 13A Twki socket. 15 1,01725 15,258.75 4,180.48 303 Supply and inszollallon of I3Amp Single synched socket above Ilse ceiling la FCU: Make: Schneider. While PVC 25 Nos. 2,291.75 57,281.25 15,693.49 3D9 Supply and installallon Cl 13Amp Single synched socket above Ilse ceiling for water Neat
DESCRIPUON OTT UNIT UNIT PRICE (AED1 AMOUNT (AED) AMOUNT (USD) V PRELIMINARIES M M — -- Design Procedures (includes Design & concept. Consrucilon & waking trawigs) 1 Item 1740./0040 1,244400.00 341931.51 Supply of required approvals from authority ( Muncipality/ CM cetencei and Local mana
lor 13A Twin socket. 15 1,627.63 24,61403 6,685.77 303 Supply and installoIon of I3Amp Single synched socket above lobe ceiling la FCU: Make: Schneider, White PVC 25 Nos. 3,64403 9149310 25,10939 3.09 Supply and installoIon of I3Amp Single synched socket above false ceiling lawater Neater: Ma
O RM. DESCRIPTION WY UNIT UNIT PRICE IAED1 AMOUNT (AED) AMOUNT (USD) P PRELIMINARIES • -- Design Procedures (Includes Design & concept. Consrucilon & waking trawigs) 1 Item 1,39).830.00 1,390,800.00 331,041.10 Supply of required approvals from aulhally ( Muncipality/ avi Defence and Local m
Entities connected to both Schneider and Consrucilon &

United States
LOCATION
Samantha Power
PERSON
Eric Holder
PERSON
Oliver Stone
PERSON
Istanbul
LOCATIONPool Maintenance Kit
ORGANIZATIONUve Load
ORGANIZATIONInstaBallon
ORGANIZATIONJAMES ISLAND
LOCATIONMONO BASIN MIXER
ORGANIZATIONMax Floor
PERSONSUMMARY • STEEL STRUCTURE
ORGANIZATIONPVC CO/Iduil
ORGANIZATIONSupply lc Installalion
ORGANIZATIONU NIT PRICE
ORGANIZATIONClaimer
ORGANIZATIONSupply ond installoIon
ORGANIZATIONSupply & kntollolion ot GI
ORGANIZATIONSupply & Instollalion ol Boaboxwith
ORGANIZATIONSupply & tratollalion ot
ORGANIZATION