3
Shared Docs
3
Same-Page
3 / 3
Mentions
ncies can see what we are permitting. We can get Ryan Wisehart to draw the RO line and I can provide th
ika, This proposal includes the permitting of the maintenance of the existing dock through Coastal Zone Management and US Army Corps of Engineers. Dock Maintenance WE need an as•built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart t
ncies can see what we are permitting. We can get Ryan Wisehart to draw the RO line and I can provide th
ika, This proposal includes the permitting of the maintenance of the existing dock through Coastal Zone Management and US Army Corps of Engineers. Dock Maintenance WE need an as-built of the dock which shows the engineering details so that the agencies can see what we are permitting. We can get Ryan Wisehart t
k which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide th
permits but they should be minimal for the systems the size we are looking at. What is there needs works so this is something you should consider. Dock Maintenance I'll need an as-built of the dock which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide the details of
Entities connected to both Paul Ryan and Dock Maintenance

Jeffrey Epstein
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSONRyan Wisehart
PERSONAmy Claire Dempsey
PERSONFerguson Kroblin
PERSONBioimpact, Inc.
ORGANIZATIONUS Army Corps of Engineers
ORGANIZATIONCoastal Zone
ORGANIZATION