3
Shared Docs
3
Same-Page
3 / 3
Mentions
rew P. Cohen, Robert Jernigan, hilla Leiserowitz, Joe Harris EFTA00605628 Gensler Little St. James
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
rew P. Cohen, Robert Jernigan, filla Leiserowitz, Joe Harris /OA/ (Date) EFTA00724814 Gensler Litt
oject. phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
drew P. Cohen, Robert Jernigan, NIla Leiserowitz, Joe Harris EFTA00727153 Gensler Little St. James
oject. Phase One - Design 1. Schematic Design. Based on the approved Conceptual Design and Client's authorization to proceed, Gensler will develop the Schematic Design, consisting of: a) Site plan; b) Building elevations; c) Typical building sections; d) Floor plans; e) Outline description of building systems
Entities connected to both Joe Biden and the Schematic Design

Jeffrey Epstein
PERSON
Prince Andrew
PERSON
Michael Cohen
PERSON
Richard Kahn
PERSON
Samantha Power
PERSON
Legislature
ORGANIZATIONHBRK Associates
ORGANIZATION
Santa Monica
LOCATIONGensler
PERSONConstruction Administration
ORGANIZATIONEpstein Interests
ORGANIZATIONSubstantial Completion
ORGANIZATIONStandard Terms and Conditions
ORGANIZATIONProject Description
ORGANIZATIONProduct Data
ORGANIZATIONReimbursable
PERSONCivil Engineering
ORGANIZATIONFire Alarm
PERSONBulletins
PERSONStructural Engineering
ORGANIZATION