1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA00281248
quare meters) of gross floor area. 5. Must Comply with Minimum Occupancy Rates Full Time Equivalent Occupancy The LEED project must server or more Pull Time Equivalent (FTE) occupant(s), calculated as an annual average in order to use LEED in its entirety. If the project serves less than 1 annualized FTE, optional
No connected entities