1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
rials Installed such as wiring, circuit breakers, switches, annunciators, clamps, doublers, shelves, and racks will be Inspected In conjunction with the Raytheon Sectchjet 400A Phase C Inspection program, for condition, *acuity of attachment evidence of damage, and normal operation IAW FAR 25.1529 and/or applicable manufacturers service instr
No connected entities