1
Total Mentions
1
Documents
0
Connected Entities
Location referenced in documents
EFTA01339374_email_048_sub_001 - EFTA01339374_282
ades: New. Bonding straps installed. • Horizontal & Vertical Stabilizers: OK. Inspection panel installed per CSN 76.207. Static wicks installed on Horizontal Stabilizer. Cold worked T/R Pylon AR Spar Assembly fastener holes and replaced fasteners in accordance with Sikorsky CSN 76-237A. • Wheelwells & Landing Gear
No connected entities