1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02526966
side Paint etc First, Then have tubes removed for fabric=tion. Whilst the Tubes are away, Carlos and Randy will continue with Ref=t of Cabin House. Paint Topside, water sa=d bottom and polish, BVI $7500.00, plus haulage, 10days for work.</=iv> Off Shore (VI) $19,992.00, tubes removed, shipped FL for fabricat
No connected entities