1
Total Mentions
1
Documents
0
Connected Entities
Organization referenced in documents
EFTA02672450
orrosion - =28,750.00 -Labor to replace Nose landing gear - $8,256.00 -Repair Aux Fuel tank Circuit control panel $27,100.00 -Xray inspection NDT (Non Distractive Testing) =4,600.00 -touch up Paint from corrosion repair - $7,056.00 -remove Aux Fuel tanks for Bladder inspection $55,000.00 EFTA_R1_01945829 EFTA026724
No connected entities