Name reference in documents
EFTA01366912
r the PPA terms with ENEE, the Company had to buiki, at Its own cost, tie hip voltage section of the electncal substations on behalf of ENEE Because Energla Educe has to transfer ownership of such section to ENEE, the correspondirg construction costs were cores:Wed as a ngM to operas the wird inject and theref