2
Total Mentions
2
Documents
0
Connected Entities
Location referenced in documents
EFTA01366875
Page 446 of 868 I Alt If Conon` In December 2014 The Company started operations at Runanit Ii l-hictoelectnc Plant *tech te located all along the Runatullo River located at 6 Km in the department of Junn which has 191 MW of installed capacity 2. Basis of preparation and changes to accounting policies 21 Ba
EFTA01367094
Page 665 of 868 I Air a Coinon, In December 2014. tne Company started operations at Runatullo I i Hytroelectric Plant ?Mich s located all along the Runatullo River located at 6 Km in the department of Junin, which has 191 MW of installed capacrty (e) Main contracts Erreenng. PICCunfenent and Gourmet on rEPC7
No connected entities