EFTA01366717
and restncted payment ratios We expect to repay this project-level indebtedness with the proceeds from This offering Our Peru prefects Junin The Junin project is finned with a U S dallar-sfenaminated syndCated credit faedty. wroth fad an OutStandro principal arroure d approximately 560 9 man as of
EFTA01366874
op eleancgeneratonactwites at the Runettilo III Hydroelectric Plant located in Me Manscal Castilla and Comas dada pronrce of Concepoon department of Junin Also, through Minsterial Resolution N• 114.2012.MEWDM, dated March 2, 2012 the Penman State via MEM awarded theConvent the delimit concession to dev
EFTA01367094
e Company started operations at Runatullo I i Hytroelectric Plant ?Mich s located all along the Runatullo River located at 6 Km in the department of Junin, which has 191 MW of installed capacrty (e) Main contracts Erreenng. PICCunfenent and Gourmet on rEPC7 Contract be RAWL:lb ft end Runetufflo lU Hi
EFTA01367093
erteraton actwities at the Ronan-Co III HydrOeleCtric Plant located in the Manscal Castilla and Comas OstrictS. province of ConcepoOn. department of Junin Also, through Minstenai Resolution N• 114.2012_MEM/D14. dMed March 2, 2012 the Penman State via MEM awarded theCom:en/ the definte cOnceSsiOn todeve

Samantha Power
PersonIrish-American academic, author and diplomat
Empresa de Generaci6n Electrica de Junin
OrganizationOrganization referenced in documents
Perwen
OrganizationOrganization referenced in documents
OSINERGMN
OrganizationOrganization referenced in documents
Latin America Power
LocationLocation referenced in documents
Manscal Castilla
PersonName reference in documents